Chapter 6 – Non Compliance with Grid Code

In case of non-compliance with any of the technical provisions in this Grid Code, CEB shall inform the owner in writing of the discrepancies. The SSDG owner shall have 30 days to rectify the discrepancies.

Failing to do that, CEB shall be entitled to disconnect the SSDG installation.

CEB shall be entitled to disconnect the SSDG without prior notification if the installation conditions are harmful or creates unavoidable risks for the safety.

CEB shall not be responsible for any damage if such disconnection requires the disconnection of other loads associated or connected to the same connection as the SSDG.

Reconnection of the SSDG shall require that CEB certifies that the installation complies with this Grid Code. Fees applicable shall be the same as for reconnection fee.