Brand Logo
Brand Logo
Home Grid Code Contact
  • FR FR

Annex 2: Feed In Tariff (FIT)

Tariff, if applicable, will be determined according to the prevailing tariff scheme in force.

Refer to CEB website for more details.

← Previous: Annex 1 Next: Annex 3 →

Table of Contents

  • Home
  • Chapter 1 - Purpose of Grid Code
  • Chapter 2 - Connecting Small Scale Distributed Generators (SSDG) to the CEB Grid
  • Chapter 3 - Grid Code Requirements and Safety Aspects
  • Chapter 4 - Conditions on Network for Review of Applications/ Reconstruction of Network
  • Chapter 5 - Grid Code Modifications
  • Chapter 6 - Non Compliance with Grid Code
  • Annex 1: Abbreviations and Definitions
  • Annex 2: Feed in Tariff (FIT)
  • Annex 3: CEB Fees
  • Annex 4: SSDG Application Form
  • Annex 5: Certificate of Installation
  • Annex 6: Certificate for Commercial Operation
  • Annex 7: Connection Agreement

Navigation

  • Home
  • Chapter 1 - Purpose of Grid Code
  • Chapter 2 - Connecting Small Scale Distributed Generators (SSDG) to the CEB Grid
  • Chapter 3 - Grid Code Requirements and Safety Aspects
  • Chapter 4 - Conditions on Network for Review of Applications/ Reconstruction of Network
  • Chapter 5 - Grid Code Modifications
  • Chapter 6 - Non Compliance with Grid Code
  • Annex 1: Abbreviations and Definitions
  • Annex 2: Feed in Tariff (FIT)
  • Annex 3: CEB Fees
  • Annex 4: SSDG Application Form
  • Annex 5: Certificate of Installation
  • Annex 6: Certificate for Commercial Operation
  • Annex 7: Connection Agreement
Copyright 2021, SSDG.MU All Rights Reserved