Brand Logo
Brand Logo
Home Grid Code Contact
  • FR FR

Chapter 5 - Grid Code Modifications

CEB will propose a new version of this Grid Code in case that:

  1. some of the values included in it needs to be modified due to the evolution of the system.
  2. the amount of generation in one or more of the segments considered requires a more severe control.
  3. a better adequacy to operation conditions is required.
← Previous: Chapter 4 Next: Chapter 6 →

Table of Contents

  • Home
  • Chapter 1 - Purpose of Grid Code
  • Chapter 2 - Connecting Small Scale Distributed Generators (SSDG) to the CEB Grid
  • Chapter 3 - Grid Code Requirements and Safety Aspects
  • Chapter 4 - Conditions on Network for Review of Applications/ Reconstruction of Network
  • Chapter 5 - Grid Code Modifications
  • Chapter 6 - Non Compliance with Grid Code
  • Annex 1: Abbreviations and Definitions
  • Annex 2: Feed in Tariff (FIT)
  • Annex 3: CEB Fees
  • Annex 4: SSDG Application Form
  • Annex 5: Certificate of Installation
  • Annex 6: Certificate for Commercial Operation
  • Annex 7: Connection Agreement

Navigation

  • Home
  • Chapter 1 - Purpose of Grid Code
  • Chapter 2 - Connecting Small Scale Distributed Generators (SSDG) to the CEB Grid
  • Chapter 3 - Grid Code Requirements and Safety Aspects
  • Chapter 4 - Conditions on Network for Review of Applications/ Reconstruction of Network
  • Chapter 5 - Grid Code Modifications
  • Chapter 6 - Non Compliance with Grid Code
  • Annex 1: Abbreviations and Definitions
  • Annex 2: Feed in Tariff (FIT)
  • Annex 3: CEB Fees
  • Annex 4: SSDG Application Form
  • Annex 5: Certificate of Installation
  • Annex 6: Certificate for Commercial Operation
  • Annex 7: Connection Agreement
Copyright 2021, SSDG.MU All Rights Reserved