Annex 5: Certificate of Installation
After completing the SSDG installation, Applicant/Installer shall submit a duly filled and signed "Certificate of Installation" to the CEB (available on the CEB website).
The certificate includes:
1. Equipment Details
- Photovoltaic Modules (Make/Model, Rating, Quantity)
- Inverter specifications (Output AC Rated Power, Serial Number)
2. Inverter Protection Settings
- Over Voltage settings (230 V + 10% and 230 V + 6%)
- Under Voltage (230 V - 6%)
- Over Frequency (50 Hz + 2%)
- Under Frequency (50 Hz - 6%)
- Loss of Mains (df/dt - Vector shift)
- Reconnection Time
- Set Active Power Limit (if applicable)
- Line impedance
3. Certification
The certificate must be signed by:
- The Certified Installer (with company details and seal)
- The Applicant
Important: This certificate certifies that the installation has been done as per the requirements of the SSDG Grid Code (Ver. 2.3) and includes a detailed schematic diagram.